Case: Burger King Östersund
Conditions
Type of business:
Fast-food Restaurant
Name:
Burger King
City:
Östersund
Country:
Sweden
Lepido Model:
L12
Outdoor design temperature:
-20°C
Airflow:
1000 l/sec
Exhaust temperature in air duct:
24°C
Ideal inlet air temperature:
18°C
Operating hours/day:
16 hours
Calculated total energy recovered/year:
120 000 kWh/year
Energy used for:
Ventilation, Tap water & under-floor heating
Calculated CO2 savings/year:
6.3 ton
Property owner:
NP3 Fastigheter
Construction company:
Fastec
Contractor:
Teknisk klimatservice Norr AB
Installed:
June 2019
”If it sounds too good to be true, it probably is. But with Lepido it's the other way around, the systems work much better than expected”
ANDRÉ VEIE ENGH
CONSTRUCTION TEAM MANAGER, BURGER KING SCANDINAVIA