fargstarkt-case-1
Case: Restaurant Färgstarkt

Restaurant Färgstarkt, Lund, Sweden

There are limits to what you can do in a listed building and this added a layer of complexity during the installation of an energy recovery system for Restaurant Färgstarkt. Lepido, paired with a heat pump, was chosen thanks to its flexibility. 

A visual of the energy Lepido has recovered for Färgstarkt. Comfort cooling is not displayed in the graph.
A visual of the energy Lepido has recovered for Färgstarkt. Comfort cooling is not displayed in the graph.
Conditions
Type of business: Fine dining
Name: Restaurant Färgstarkt
City: Lund
Country: Sweden
Lepido Model: L12
Outdoor design temperature: -16°C
Airflow: 1200 l/sec
Exhaust temperature in air duct: 24°C
Ideal inlet air temperature: 20°C
Operating hours/day: 14 hours
Calculated total energy recovered/year: 60 000 kWh/year
Energy used for: Heating/ Ventilation
Calculated CO2 savings/year: 4.2 ton
Property owner: Pär Lundberg Fastighets AB
Contractor: Assemblin Ventilation Malmö
Installed: Aug 2019

Calculated total energy recovered per year in kWh